The mud jacking item template has roughly 10 items which mostly consist of the different jacking muds and the fill calculation to go with each.
This template is primarily based on entry of the area measurements (BD FT) which will then calculate the needed material to complete the project. The jacking mud will be output in terms of LB required
This template does not have the labor incorporated into the item assemblies, that will need to be added separately. The final project price will be based on the manual entry of hours and the calculation of LB based on the BD FT being filled. More on the specific pricing and understanding item assembly setup.
This is a list of some of the items included in the mud jacking item template.
- 3 LB / YD 3 Mud Jacking 1 side (BD FT)
- 3 LB / YD 3 Mud Jacking 2 side (BD FT)
- 3 LB / YD 3 Mud Jacking 4 side (BD FT)
- 4 LB / YD 3 Mud Jacking 1 side (BD FT)
- 4 LB / YD 3 Mud Jacking 2 side (BD FT)
- 4 LB / YD 3 Mud Jacking 4 side (BD FT)
- 5 LB / YD 3 Mud Jacking 1 side (BD FT)
- 5 LB / YD 3 Mud Jacking 2 side (BD FT)
- 5 LB / YD 3 Mud Jacking 4 side (BD FT)
- Mud Jacking Labor Labor (hour)
- Materials, various (3 LB / YD3 jacking mud, 4 LB / YD3 jacking mud, etc)
The pros for using this item template is that Estimate Rocket will calculate the LB needed for each phase of the project which will be published on the work order for easy reference by your field supervisor or crew.