The epoxy floor coating item template has roughly 15 items that range from surface preparation through finish application.
This template is primarily based on entry of the surface dimensions / item count which will then calculate the needed time and materials to complete the project.
The final project price will be based on the calculation of hours and materials and the price of the labor and price of the specific materials. More on the specific pricing and understanding item assembly setup.
This is a list of some of the items included in the epoxy floor coating item template.
- Floor Prep (hour)
- Moisture Test (each)
- Sealant- caulk cracks (linear foot)
- Primer Coat (SQ FT)
- Base Coat (SQ FT)
- Top Coat 1st (SQ FT)
- Top Coat Additional (SQ FT)
- Aggregate (SQ FT)
- Flooring Labor (hour)
- Materials, various (base coat, primer coat, top coat, aggregate)
The pros for using this item template is that Estimate Rocket will calculate the hours and materials needed for each phase of the project which will be published on the work order for easy reference by your field supervisor or crew.