The general scope of work item is not intended to add any dollars to the project total but to essentially server as a comprehensive overview of the work that will be done on the project. The presented scope of work includes a description of each of the items that have been provided in the Example item template. This scope of work would ideally be edited for use and on a project by project basis. If your projects all have a similar scope of work feel free to edit the scope of work to suit your needs.
- Detailed work description for your customer to see
In this sample project the general scope of work is added to a project
Line Item is Added Directly to the Project
- General Labor Hours = NA
- Production rate of service = NA
- Labor Calculation 1 = NA
- Labor Calculation 2 = NA
This line item can be edited by clicking on the edit line item button.
A Preview of the Estimate shows the customer the detailed scope of work
Estimated Profit Margin
There is no profit margin calculated here because there are no dollars added to the project.
Edit the Scope of work as needed
Edit the existing line item as needed on each project to have a formatted look with bullets for your client.