Foundation Repair Item Template

The foundation repair item template has roughly 20 items that range from leak repair to full foundation structural analysis and piers installed.

This template is primarily based on entry of the surface dimensions / item count which will then calculate the needed time and materials to complete the project. 

The final project price will be based on the calculation of hours and materials and the price of the labor and price of the specific materials. More on the specific pricing and understanding item assembly setup.

If there is a need for water control measures such as installation of interior / exterior drainage systems, crawl space encapsulation, sump pump or dehumidifier installation those are in the Mold and Water Remediation item template.

If there is a need for basic poly lifting there is also a Poly foam lifting item template. Your final list of items may combine what is in this template, the water remediation template and the poly foam lifting template.

This is a list of some of the items included in the foundation repair template.

  • Structural Engineering Report (EA)
  • Local Foundation Repair Permits (EA)
  • Foundation Seam Seal with Caulk (LNFT)
  • Foundation Concrete Joint Repair (LNFT)
  • Steel Strip Installation (SQFT)
  • Carbon Fiber Strip Installation (SQ FT)
  • Excavation - Foundation Repair (CUFT)
  • Concrete Shoring Pad Installation (EA)
  • Concrete Piling Pad Installation (EA)
  • Drilled Concrete Pier Installation (EA)
  • Helical Pier Installation (EA)
  • Offset Steel Pier Installation (EA)
  • Foundation Repair Labor (hour)
  • Seam Seal Caulk (material)
  • Concrete Joint Repair Compound (material)
  • Carbon Fiber Strips (material)
  • Steel Strips (material)
  • Concrete Shoring Pad (material)
  • Concrete Piling (material)
  • Drilled Concrete Pier (material)
  • Helical Pier (material)
  • Offset Steel Pier (material)


The pros for using this item template is that Estimate Rocket will calculate the hours and materials needed for each phase of the project which will be published on the work order for easy reference by your field supervisor or crew.

Full List of Item Templates



Can’t find what you’re looking for?

Our award-winning customer care team is here for you.

Contact Support