Your First Chimney Sweep project in Estimate Rocket with Change Order

Quick Estimates

Estimate Rocket allows an estimator to quickly capture the details of a project using a flexible estimating process and to deliver a proposal for electronic signature on the spot. 

The following allow for the process to be quick:

  • Pulling items from a library of services that allow the estimator to quickly choose and set a price for the specific scope of work.
  • Organizing the item library to be job type specific to save the estimator time.
  • Allows for any estimating technique:
    • General items
    • Time and material based scope of work
    • Site measurement type entries
  • The library of items can be setup with these different type of items and the items can be mixed across the different methods within the same estimate.

Your First Chimney Sweep Estimate with Change Order 

Your Estimate Rocket chimney sweep account will be loaded with items that are based on unit pricing. The unit pricing for these items are typically going to be per count but others are also possible. The items are configured to calculate some material and labor based on the units needed for the project scope of work. These items can be updated in the library or edited on a project by project basis. Estimating can be done by using items with production rates (built in budgeted hours) or by using the time and material method. In this case a change order is also added based on the findings of the chimney inspection.


Calculating the price of the project

The chimney sweep setup of items will allow you to enter the count of items or enter straight time and materials. Installed items will typically have an associated budgeted time and material for each. Time and material can also be added directly to a project if measuring is not realistic.


Video of adding a chimney sweep estimate with additional repairs in a change order

 


Other Interesting Articles

Your first estimate (various industries)

Your first interior painting estimate with measurements

Your first interior painting estimate with time and materials

Your first interior painting estimate with general line item

You first exterior painting estimate with measurements

Your first exterior painting estimate with time and materials

Your first exterior painting estimate with general line item

Your first concrete lifting estimate

Your first decorative concrete estimate

Your first general contractor estimate

Your first bathroom remodel estimate with optional upgrades

Your first kitchen remodel estimate with optional upgrades

Your first general remodel estimate

Your first construction estimate

Your first insulation estimate

Your first foundation repair estimate

Your first landscaping / hardscaping estimate

Your first mold remediation estimate

Your first crawl space encapsulation estimate

Your first roofing estimate

Your first property maintenance (handyman) estimate

Your first window / door replacement estimate

Your first paving estimate

Your first masonry estimate

Your first electrical estimate

Your first plumbing estimate

Your first pressure washing estimate

Your first cleaning estimate

Your first epoxy flooring estimate

Your first chimney sweep / repair estimate with change order

Your first HVAC estimate

Your first parking lot striping estimate



Not an Estimate Rocket user yet?
Start your Free 30-Day Trial or Book a Demo.